Early morning view of a zinc recycling yard from a low hillside — mist clinging to stacked zinc bundles, a flatbed truck arriving on gravel, golden-hour light over an industrial working estate

Zinc Recovery Specialists · UK

Your Scrap Has
Somewhere Better
to Go.

Spent zinc — gutter offcuts, galvanizing dross, die-cast runners — weighed, graded, and returned to the melt cycle before it touches landfill.

Free Scrap Valuation

What's your zinc worth?

No email required · Response within 2 hours on working days

EA Permitted CarrierBS EN 12844 Certified IngotSame-Day Assay ResultsISO 14001 DocumentationLME-Linked PricingCarbon Avoidance CertificatesUK-Wide CollectionZero Landfill GuaranteeEA Permitted CarrierBS EN 12844 Certified IngotSame-Day Assay ResultsISO 14001 DocumentationLME-Linked PricingCarbon Avoidance CertificatesUK-Wide CollectionZero Landfill Guarantee
Case 01Residential Contractor

Gutter Offcuts Turned Certified Ingot

Yorkshire, UK
Stacked zinc gutter offcuts on a roofing contractor's flatbed truck in early morning light
0.0tZinc Recovered
0.0tCO₂ Avoided
£0£Credit Issued
1
Problem

A Roofing Firm With Nowhere to Send Its Scrap

Fletcher & Sons complete 40–60 residential re-roofing projects per year across West Yorkshire. Each job leaves behind 80–120 kg of zinc gutter offcuts, downpipe sections, and flashing strip. With landfill levies rising to £126/tonne, their skip costs had become a line item the estimator could no longer hide.

2
Process

Single Collection, Clean Assay, Same-Day Credit

Smelt issued a prepaid collection note for a single flatbed load — 1.4 tonnes of clean sheet/strip offcuts, no pre-sorting required. Material arrived at the yard at 07:30; assay results (99.1% Zn) were transmitted by 11:00. A credit note was issued before lunch.

3
Outcome

Scrap Cleared, Landfill Levy Eliminated

Fletcher & Sons received £1,840 in material credit — enough to offset three months of skip hire. The firm now schedules a quarterly Smelt collection as standard, keeping their yard clear and their estimating costs honest.

Case 02Galvanizing Plant

Dross Accumulation Resolved Without Compliance Risk

West Midlands, UK
Industrial zinc galvanizing bath with molten metal and dross accumulation in a factory setting
0.0tDross Recovered
0.0tCO₂ Avoided
£0£Credit Issued
1
Problem

18 Months of Dross With No Compliant Route

Midlands Hot-Dip Ltd operate two galvanizing lines processing structural steelwork. Their bottom dross — a zinc-iron intermetallic compound averaging 94% Zn — had been accumulating in IBC containers for 18 months. Their previous recycler had lost its environmental permit; the plant was approaching the threshold requiring a formal waste declaration.

2
Process

Permitted Carrier, Segregated Furnace Allocation

Smelt holds EA Waste Carrier Licence No. CBDU285431. A specialist vacuum tanker collected 12.4 tonnes of bottom dross across two visits. Material was segregated by iron content into two furnace allocations — high-iron dross routed to the zinc-aluminium alloy stream, low-iron to primary remelt. Full consignment notes and waste transfer documentation issued within 24 hours.

3
Outcome

Compliance Restored, 11.6 Tonnes Back in the Melt Cycle

Midlands Hot-Dip received certified waste transfer documentation suitable for their ISO 14001 audit, plus a material credit of £14,200. The plant now operates a 90-day dross removal schedule with Smelt, preventing future accumulation.

Case 03Manufacturing Decommission

Full Die-Cast Line Decommissioned in 11 Days

Sheffield, UK
Large industrial manufacturing facility with die-casting equipment and zinc ingot stacks ready for decommissioning
0tAlloy Recovered
0.0tCO₂e Avoided
£0£Credit Issued
1
Problem

A Closed Zinc Die-Cast Facility, Mixed Alloy, No Inventory

When Precision Components Ltd ceased die-casting operations, they were left with 47 tonnes of mixed zinc alloy — Zamak 3, Zamak 5, and ACuZinc5 runners intermingled with furnace skull, sprue, and flash. No alloy segregation records existed. The site lease required full clearance in 30 days. The procurement director needed a single contractor who could assay, value, remove, and certify the entire inventory.

2
Process

On-Site Assay, Alloy Segregation, Six Furnace Streams

Smelt deployed a mobile XRF spectrometer for on-site alloy identification across 312 sample points over two days. Material was segregated into six streams by aluminium and copper content. Three articulated loads moved 47 tonnes to the Sheffield furnace facility over nine days. Each stream was processed separately; secondary ingot was cast to BS EN 12844 specification. Full chain-of-custody documentation provided for the client's auditor.

3
Outcome

47 Tonnes Certified, Site Cleared in 11 Days

Precision Components received £61,400 in material credit — partially offsetting the facility's wind-down costs — plus a carbon avoidance certificate confirming 70.5 tonnes CO₂e avoided. The procurement director used the certified ingot specification to negotiate a preferential supply agreement with a die-casting customer before the site lease expired.

Free Resource

The Complete
Case Study Library

All three recovery stories — from residential scrap to full factory decommissioning — compiled into a single PDF with assay results, logistics data, and carbon certificates. Ready to hand to a procurement director.

47 pages of documented recovery cases
XRF assay results and alloy segregation methodology
CO₂ avoidance calculation methodology (WRAP-aligned)
BS EN 12844 secondary ingot specification sheets

Smelt Recovery

Case Study Library 2026

No spam. One email with the download link.